Jeff and Marci, building their custom design in Central Iowa (08/99)
|
Walls formed and ready to place the concrete. (09/99) |
The concrete "boom pump" being readied to "pump" the concrete into the wall forms. (09/99) |
A worker placing the concrete in the forms. (09/99) |
The walls are now poured, the ceiling is in place, the structure is almost ready to backfill. (09/99) |